From 19 November to 5 December 2024, Micromine held its annual global event, Micromine Momentum 2025, presenting the latest updates to its key software products. Micromine Momentum conferences were available as a free live stream in several time zones. Micromine CEO Andrew Birch provided an overview of the Micromine Momentum 2025 release.

 

 

Micromine Geobank – Geoscience data logging and management

What’s new in Micromine Geobank 2025

    • Improvements to the Sample Tracker to reduce waiting times and speed up tasks
    • Restore order instantly with the Data View Reset
    • Easy track every change with using Depth Adjustment Improvements
    • Prevent disruptions in the field with Data Grid Improvements
    • Simplify exporting and printing without manual settings, with parameters that stay in place from one session to the next

 

 

Micromine Origin – Exploration, geological modelling and resource estimation 

What’s new in Micromine Origin 2025

    • Multiple estimates (interpolations) by kriging and IDW methods for different elements, domains and search areas in the same run
    • Grade shell and lithology generation model wireframes based on artificial intelligence Grade Copilot 
    • Shell generation by grades, lithology or other parameters using enhanced Grade Сopilot based on artificial intelligence
    • Interpolation of local orientations from wireframes for further setting up dynamic anisotropy modelling 
    • Advanced features to calculate true thickness in drill holes using wireframes  

View the Micromine Origin 2025 Release in English and in russian.

 

 

Micromine Beyond – Mine design, planning, and surveying

What’s new in Micromine Beyond 2025

    • Simplify complex settings in pit design with advanced string edit and road design
    • Automatically generate operational pitshells that adapt to changing constraints
    • Interactive Underground blasting Ring Placement with real-time visualization of ring placement

View the Micromine Beyond 2025 Release in English and in russian.

 

 

Micromine Nexus – Cloud-native collaboration and data sharing

What’s new in Micromine Nexus 2025

    • Save data view sessions to share the project views using viewpoints and settings
    • New navigate link for  easy sharing within the team, providing direct access to Nexus objects
    • Joint operation and management of form sets, allowing all users to work in the same format but with different access rights
    • Preview data with previous visualisation functions to speed up navigation

View the Micromine Nexus 2025 Release in English and in russian.

 

 

Micromine Advance – Mining planning for underground metals

Officially launching in early 2025

    • Dedicated underground mine planning solution based on real engineering experience
    • Solving complex problems with real situation, including resources, constraints, geology, etc.
    • One project, unlimited scenarios – creating, testing, and adjusting project development scenarios helps to choose the best business strategy with risk management
    • Provides tools for development network validation, dependency & constraint management, comprehensive inventory modelling, integrated scenario management and real-time reporting