Micromine Momentum 2025
09.12.2024
From 19 November to 5 December 2024, Micromine held its annual global event, Micromine Momentum 2025, presenting the latest updates to its key software products. Micromine Momentum conferences were available as a free live stream in several time zones. Micromine CEO Andrew Birch provided an overview of the Micromine Momentum 2025 release.
Micromine Geobank – Geoscience data logging and management
What’s new in Micromine Geobank 2025
-
- Improvements to the Sample Tracker to reduce waiting times and speed up tasks
- Restore order instantly with the Data View Reset
- Easy track every change with using Depth Adjustment Improvements
- Prevent disruptions in the field with Data Grid Improvements
- Simplify exporting and printing without manual settings, with parameters that stay in place from one session to the next
Micromine Origin – Exploration, geological modelling and resource estimation
What’s new in Micromine Origin 2025
-
- Multiple estimates (interpolations) by kriging and IDW methods for different elements, domains and search areas in the same run
- Grade shell and lithology generation model wireframes based on artificial intelligence Grade Copilot
- Shell generation by grades, lithology or other parameters using enhanced Grade Сopilot based on artificial intelligence
- Interpolation of local orientations from wireframes for further setting up dynamic anisotropy modelling
- Advanced features to calculate true thickness in drill holes using wireframes
View the Micromine Origin 2025 Release in English and in russian.
Micromine Beyond – Mine design, planning, and surveying
What’s new in Micromine Beyond 2025
-
- Simplify complex settings in pit design with advanced string edit and road design
- Automatically generate operational pitshells that adapt to changing constraints
- Interactive Underground blasting Ring Placement with real-time visualization of ring placement
View the Micromine Beyond 2025 Release in English and in russian.
Micromine Nexus – Cloud-native collaboration and data sharing
What’s new in Micromine Nexus 2025
-
- Save data view sessions to share the project views using viewpoints and settings
- New navigate link for easy sharing within the team, providing direct access to Nexus objects
- Joint operation and management of form sets, allowing all users to work in the same format but with different access rights
- Preview data with previous visualisation functions to speed up navigation
View the Micromine Nexus 2025 Release in English and in russian.
Micromine Advance – Mining planning for underground metals
Officially launching in early 2025
-
- Dedicated underground mine planning solution based on real engineering experience
- Solving complex problems with real situation, including resources, constraints, geology, etc.
- One project, unlimited scenarios – creating, testing, and adjusting project development scenarios helps to choose the best business strategy with risk management
- Provides tools for development network validation, dependency & constraint management, comprehensive inventory modelling, integrated scenario management and real-time reporting